wiki/clients/current/crazy-lennys/2025-11-17-design-sync-notes.md Layer 2 article Client: Crazy Lenny's E-Bikes 161 words Updated: 2025-11-17
↓ MD ↓ PDF
design crazylenna print action-items

Design Sync Notes — Crazy Lenny's Action Items

Overview

During the [1], Andrzej reported completing pop-up corrections for Crazy Lenny's and identified the next outstanding task: preparing product sheets for print.

Action Items

Owner Task Status Due
Andrzej Filipiak Prepare CrazyLenna product sheets for print In Progress

Detail

Context

Crazy Lenny's was mentioned briefly in the sync as part of Andrzej's current workload. The pop-up corrections were completed and handed off; the print preparation task is the remaining open item as of this meeting.