Design Sync Notes — Crazy Lenny's Action Items
Overview
During the [1], Andrzej reported completing pop-up corrections for Crazy Lenny's and identified the next outstanding task: preparing product sheets for print.
Action Items
| Owner | Task | Status | Due |
|---|---|---|---|
| Andrzej Filipiak | Prepare CrazyLenna product sheets for print | In Progress | — |
Detail
- Andrzej finished correcting the Crazy Lenny's pop-ups and sent them to Karly for review.
- Next step is to take the product sheets and prepare them for print production. No specific deadline was set during the sync beyond the implied near-term priority.
Context
Crazy Lenny's was mentioned briefly in the sync as part of Andrzej's current workload. The pop-up corrections were completed and handed off; the print preparation task is the remaining open item as of this meeting.
Related
- [2]
- [3]