B2B Site Progress — 2026-04-05
Overview
Brief status update on the Doodla B2B site shared during the [1] team meeting. Ishaq reported that the primary technical blocker — product page variations — had been resolved, and the site was on track for completion.
Status at Time of Meeting
| Item | Status |
|---|---|
| Product page variation solution | ✅ Resolved |
| Product page build-out | 🔄 In progress (completing same day) |
| Wholesaler details | ⏳ Pending — next step after product pages |
| Overall site | Nearing completion |
Key Updates
- Product variation blocker resolved. Ishaq had spent significant time on the product page variation problem and found a working solution. Implementation was expected to be applied and completed the same day (2026-04-05).
- Wholesaler details next. Once the product pages were finalized, the remaining task was adding wholesaler information before the site could be considered complete.
- No blockers reported. No outstanding dependencies or client-side delays were mentioned.
Relevant Transcript Excerpt
Melissa: And then how about the Doodla?
Ishaq: Doodla B2B. In product page, there is a variation option for this. I worked a lot, but I find the solution for this. Maybe today. Today, I will apply and complete the product page. And after that, I will add all wholesaler details. Then maybe it will complete.
Action Items
| Owner | Task |
|---|---|
| Ishaq | Apply product variation solution and complete product pages |
| Ishaq | Add wholesaler details to finalize site |