JBF Website Development Status
Overview
Website development for [1] is proceeding independently of the ongoing [2]. Page builds are not blocked by the GoDaddy or Google Workspace situation and are moving forward on schedule.
Current Status
- Phase: Final mock-up tweaks and copy integration
- Next phase: Development (page builds)
- Blocker: None — domain resolution is not a dependency for this work
Mock-up approvals have been received from the client. The internal team is incorporating final copy and design adjustments before moving into active development.
Asset Collection
Client-side photo assets are being gathered and uploaded to the shared Miro board for use across site pages.
- Owner: Lisa Frommelt (client contact)
- Deadline: Sunday night
- Destination: Miro board (shared with Lisa's Lumarie email by Melissa)
- Requirement: Photos should be in landscape orientation where applicable, with at least one image per page
Melissa Cusumano is responsible for ensuring Lisa has edit/upload access to the Miro board. As of the meeting, access was being re-granted directly via email invite after a permissions issue with the shared link.
Action Items
| Owner | Task | Status |
|---|---|---|
| Lisa Frommelt | Upload all website photos to Miro board | Due Sunday night |
| Melissa Cusumano | Share Miro board with Lisa's Lumarie email | In progress |
| Asymmetric team | Complete final mock-up tweaks and copy integration | In progress |
| Asymmetric team | Begin page builds / development | Pending asset delivery |
Notes
- Development timeline is decoupled from the domain/email resolution track
- Client was reassured that page builds will not be delayed while the GoDaddy and Google Workspace issues are worked through in parallel
- See [3] for the infrastructure blocker context