---
title: SOAR Course Review — 2026-03-06
type: article
created: '2026-03-06'
updated: '2026-04-05'
source_docs:
- raw/2026-03-06-agility-recovery-soar-course-127936965.md
tags:
- agility-recovery
- soar-course
- instructional-design
- copilot
- course-development
- meeting
layer: 2
client_source: Agility Recovery
industry_context: elearning
transferable: false
---

# SOAR Course Review — 2026-03-06

## Overview

Working session with Gus Donelson (Agility Recovery) and Isalia Ramirez to review and refine in-progress SOAR course modules. The call covered four areas: Co-pilot module refinements, Prompt Cowboy removal, a live edit to the Storytelling module scenario, and planning for the upcoming Tech Stack module.

**Attendees:**
- Mark Hope — Asymmetric
- Isalia Ramirez — Asymmetric
- Gus Donelson — Agility Recovery (external)

---

## Key Decisions

### Co-pilot Module

- **Gus will record new seller-perspective videos** to replace current placeholder recordings. Isalia will provide high-level outlines for each required segment.
- **Prompt Cowboy activity removed.** The tool generates multi-page prompts that are impractical for the course's goals. The activity will be replaced with a native Co-pilot prompt exercise instead. Prompt Cowboy may be mentioned as an optional resource (tip box) but will not be a required activity.
- **Co-pilot data retention callout updated to "approximately 6 months."** Gus tested live during the call and confirmed Co-pilot history goes back to at least November 2025 (from a March 2026 reference point). Six months was agreed as a safe, accurate callout.
- **Isalia will re-record her video segments** to fix crackling audio caused by a poor internet connection during the original recording.

### Storytelling Module

- **UPS systems reference removed from scenario.** A scenario in the "Power of Storytelling" module referenced UPS (uninterruptible power supply) systems — a service Agility Recovery does not offer. Gus edited the scenario live during the call.
- **Revised scenario** now focuses on Agility's standard 12–6 hour response time and the potential need for an on-site generator, accurately reflecting the company's actual capabilities.
- Gus will re-upload the corrected scenario in Jilly.

### Tech Stack Module

- **Abby (admin) has created the SharePoint folder structure** but has not yet uploaded content/SOPs.
- **Isalia will share a high-level outline** with Gus after the call, following the same format used in earlier modules.
- **Gus will review the outline and share with Abby and a sales AE** for directional feedback.
- **Two content creation paths under consideration:**
  - **Option A:** Schedule a live walkthrough/informal training session with Abby (and possibly the AE).
  - **Option B:** Provide Abby and the AE with recording guidance and have them record directly.
- **Rationale for including a sales AE:** A seller's perspective on tool usage is more relevant to the course audience than an admin's view. The AE may also produce better-quality instructional video than Abby would.

### Scheduling

- **March 19–20 meetings canceled** due to conflicting travel (Gus) and a personal trip (Isalia).
- **Next meeting to be rescheduled** to either March 18 or March 23; decision to be made the following week.

---

## Action Items

| Owner | Item |
|---|---|
| Isalia | Send video outlines to Gus for Co-pilot module; Gus to record/replace placeholders |
| Isalia | Update Co-pilot module: add ~6-month data retention callout; remove Prompt Cowboy activity; set activity in Co-pilot |
| Isalia | Re-record crackly video segments when connection is stable |
| Isalia | Share Tech Stack module high-level outline with Gus |
| Isalia | Add FG/PG to manual; share with Gus |
| Gus | Re-upload updated Storytelling scenario in Jilly |
| Gus | Review Tech Stack outline; share with Abby and sales AE for feedback |
| Gus | Record new seller-perspective video segments for Co-pilot module |
| Gus + Isalia | Decide on Tech Stack content creation approach (live walkthrough vs. guided self-recording) |
| Gus + Isalia | Reschedule March 19–20 meeting to March 18 or March 23 |

---

## Related

- [[wiki/clients/current/agility-recovery/_index]]