---
title: Cordwainer Event Design Pipeline — Through June
type: article
created: '2026-03-10'
updated: '2026-03-10'
source_docs:
- raw/2026-03-10-weekly-call-w-sebastian-128671517.md
tags:
- client-cordwainer
- event-design
- planning
layer: 2
client_source: The Cordwainer
industry_context: senior-living
transferable: false
---

# Cordwainer Event Design Pipeline — Through June

## Overview

During the March 10 weekly sync, Sebastian reported a check-in call with The Cordwainer and Carly Joand. Despite a rough start due to tech issues in the first 20 minutes, the call was productive. The client is preparing to send their full event schedule through June, enabling the team to get a head start on design work rather than reacting to individual event requests.

## Status

- **Client relationship:** Active, positive
- **Call outcome:** Good check-in; client is happy
- **Design pipeline:** Pending receipt of event details through June

## Key Details

- Carly Joand is the primary contact on the client side for this engagement
- The client experienced tech issues for the first ~20 minutes of the March 10 call
- The Cordwainer is sending event details through June so the team can begin proactive design work ahead of each event

## Next Steps

- [ ] Receive event schedule through June from The Cordwainer / Carly Joand
- [ ] Begin proactive design work once event details are in hand

## Related

- [[wiki/clients/current/cordwainer/_index]]
- [[wiki/meetings/2026-03-10-weekly-call-w-sebastian]]