---
title: Overhead Door Location Pages Build
type: article
created: '2026-01-22'
updated: '2026-01-22'
source_docs:
- raw/2026-01-22-sprint-planning-meeting-116396706.md
tags:
- overhead-door
- page-build
- wordpress
- raphael
- sebastian
- sprint-planning
layer: 2
client_source: Overhead Door Company of Madison
industry_context: b2b-services
transferable: false
---

# Overhead Door Location Pages Build

## Overview

Templated location page builds for Overhead Door Company, reassigned from Jeff to Raphael during the 2026-01-22 sprint planning session as part of a broader developer workload rebalancing effort. The pages are already designed and ready to build; the primary dependency is content delivery from Sebastian.

## Status

**In Progress** — Task created; awaiting content from Sebastian before Raphael can begin.

## Assignment

| Role | Person |
|---|---|
| Developer | Raphael Mangadap |
| Account Manager | Sebastian Gant |
| Backup / Reference | Jeff (original developer; available for questions) |

## Task Details

- **Type:** Location page builds (templated — primarily duplication and content population)
- **Platform:** WordPress (Overhead Door site)
- **Design status:** Pages are designed; build-ready
- **Complexity:** Low-to-moderate; templated structure means Raphael will largely duplicate existing page patterns and swap in location-specific content

## Timeline

- **Content delivery:** Sebastian to provide location page content to Raphael by end of next week (week of 2026-01-26)
  - Sebastian meets with the Overhead Door client on Wednesday; access issues and content gathering to be resolved then
- **Build window:** Approximately two weeks from content delivery
- **Note:** Sebastian had a WordPress access issue at time of meeting (team login was inactive); resolved by confirming Raphael has his own individual login to the Overhead Door backend

## Background

This task was originally slated for Jeff but was reassigned during sprint planning because:

1. Jeff's queue was already overloaded, with Seamless and Next Level builds taking priority
2. Raphael had available capacity in his schedule
3. Raphael has prior experience with the Overhead Door site (previously built the Advanced Health & Safety site from scratch)

Sebastian noted the overhead location pages are similar in scope to the Advanced Health & Safety location pages — both are templated builds requiring content population rather than custom development.

## Notes

- Sebastian to include a note in the task description that Jeff is the primary reference developer if Raphael has questions about the site
- This is a parallel effort to the [[wiki/clients/current/advanced-health-safety/location-pages|Advanced Health & Safety Location Pages]] build, also assigned to Raphael
- Raphael's access to the Overhead WordPress backend was confirmed active at time of meeting

## Related

- [[wiki/meetings/2026-01-22-sprint-planning|Sprint Planning Meeting — 2026-01-22]]
- [[wiki/clients/current/overhead-door/_index|Overhead Door Client Index]]
- [[wiki/team/raphael-mangadap|Raphael Mangadap]]
- [[wiki/process/developer-due-date-policy|Developer Due Date Policy]]