# LaMarie Beauty — Bookly Integration Requirements & Timeline

## Overview

The Bookly integration for La Marie Beauty is currently **on hold** pending completion of service page mockups. These mockups must be reviewed and approved by Lisa (client stakeholder) before the Bookly implementation can proceed. This dependency was confirmed during the [[meetings/2025-10-21-la-marie-beauty-project-call|2025-10-21 project sync]].

---

## Integration Gate: Mockup Approval Required

The team confirmed that the service page mockup phase is a **hard prerequisite** for Bookly integration. The desired UX — where service options update dynamically as a user clicks through variants — needs to be validated in mockup form before any booking plugin work begins.

> *"We need Eshek to kind of play around with a couple of the services to see if he can have it laid out the way that Lisa likes… that needs to happen first before we can implement Bookly."*
> — Katie Schueller, 2025-10-21

---

## Mockup Scope

- **Owner:** Eshek (design/dev resource, Asymmetric side)
- **Service chosen for mockup:** "Vampire" service page
  - **Rationale:** The Vampire service has more option variants than a simple two-choice service, making it a robust test case for the dynamic click-through layout. It is neither the most complex nor the most trivial service in the catalog.
- **Interaction pattern:** Options should change/update dynamically as the user clicks through selections on the page.

---

## Current Blocker: Eshek's Availability

Eshek's mockup work is paused due to his involvement in the **"American Extractions" website launch**, which encountered post-launch hiccups. He will resume La Marie mockup work once that project stabilizes.

- **Expected timeline:** A few days after American Extractions is fully stable — estimated 1–2 days of work once he resumes.
- **Action owner:** Melissa Cusumano will follow up with Eshek and distribute mockups to the team upon completion.

---

## Parallel Blocker: Zapier–Square Appointment Creation

Separately, the Zapier automation that should create appointments in Square is failing at the final step. This is a second open blocker for the broader integration, though it does not block the mockup phase.

See: [[knowledge/integrations/zapier-square-appointment-creation-failure|Zapier–Square Appointment Creation Failure]]

---

## Approval Path

```
Eshek completes mockups (Vampire service page)
        ↓
Melissa shares mockups with Katie + Lisa
        ↓
Lisa approves layout / interaction pattern
        ↓
Bookly integration implementation begins
```

---

## Related

- [[clients/la-marie-beauty/_index|La Marie Beauty Client Index]]
- [[meetings/2025-10-21-la-marie-beauty-project-call|Meeting: La Marie Beauty Project Call — 2025-10-21]]
- [[knowledge/integrations/zapier-square-appointment-creation-failure|Zapier–Square Appointment Creation Failure]]