# Sprint 47 Board Hygiene & Task Management

## Overview

At the Sprint 47 kickoff (2025-10-30), the team identified two recurring issues that undermine effective sprint planning: overdue tasks left unresolved on the board ("reds"), and missing or inaccurate time estimates that make workload reports unreliable. Both issues were escalated to team-wide action items with a same-day deadline.

---

## Red Task Cleanup

"Red" tasks are overdue items that have not been updated, closed, or moved to an appropriate status. Leaving them on the board creates noise and makes it difficult to assess actual sprint health.

**Standard:** All red tasks must be resolved by EOD the following day after they are identified in a sprint review. Resolution means one of:

- Updated with a new realistic due date
- Moved to **Done**
- Moved to **Client Review** (if awaiting external feedback)
- Closed if no longer relevant

> *"Anything red, let's move it at least till tomorrow, if everybody can look at their stuff."*
> — Melissa Cusumano, Sprint 47 Planning

The Internal Reviews section was specifically called out as having a cluster of reds during Sprint 47 planning. Account managers and coordinators are responsible for ensuring their own task statuses reflect reality.

---

## Time Estimate Accuracy

ClickUp's workload view is driven entirely by **time estimates on tasks**, not tracked time. If estimates are missing or wildly inaccurate, the workload report is meaningless for planning purposes.

**Standard:** Every task — new and existing — should carry a realistic time estimate before the sprint begins.

> *"Unless we don't have the time estimates in there accurately, this really is not accurate."*
> — Melissa Cusumano, Sprint 47 Planning

### Why This Matters

- The workload view showed several team members appearing to have zero work, when in fact they had active projects — simply because estimates were absent.
- One team member appeared to have 15 hours scheduled in a single day, an artifact of tasks bunching at sprint start rather than a real overload.
- Without estimates, sprint capacity planning is guesswork.

### Clarification: Estimates vs. Tracked Time

Workload reports look **forward** using estimates. Tracked time is historical and does not factor into the workload view. Both serve different purposes:

| Metric | Purpose | Source |
|---|---|---|
| Time Estimate | Sprint capacity planning | Set manually on each task |
| Tracked Time | Billing, retrospectives | Logged during/after work |

---

## Board Rename: Known ClickUp Bug

During Sprint 47 setup, a ClickUp permission bug prevented Melissa from renaming the sprint board. The rename had to be performed by Chris (admin-level access). This is a known limitation — board renames may require elevated permissions depending on how the workspace is configured.

**Workaround:** If you cannot rename a sprint board, escalate to Chris or another admin rather than attempting workarounds that may corrupt the board name.

---

## Action Items from Sprint 47 Planning

| Owner | Action |
|---|---|
| All | Update or close all red tasks by EOD 2025-10-31 |
| All | Add accurate time estimates to all tasks |
| Melissa | Move SOPs and stand-up tasks to Sprint 47 board |
| Chris | Rename Sprint 46 board to Sprint 47 |

---

## Related

- [[wiki/meetings/2025-10-30-sprint-47-planning.md]]
- [[wiki/knowledge/project-management/clickup-workload-reporting.md]]