wiki/clients/current/ahs/2026-03-24-template-follow-up.md · 176 words · 2026-03-24
Template Follow-up — Integration Requirements
Overview
During the [1], Mark and Sebastian briefly touched on the status of AHS integration work. Progress is blocked pending receipt of templates from Gina (AHS primary contact), who had been on vacation for approximately 10 days prior to the call.
Status
- Blocked. Gina has not yet sent the templates required for integration work.
- Gina was returning from vacation around the time of this call, which explains the delay.
- No templates have been received by Mark as of 2026-03-24.
Context
Mark noted that once the templates are received, the team can "tighten it up" — implying the integration work is scoped and ready to execute, but cannot proceed without the source material from the client.
Action Items
- [ ] Sebastian to remind Gina to send the required templates (flagged as same-day action on 2026-03-24)
- [ ] Mark to proceed with integration work upon receipt of templates