wiki/clients/current/bluepoint/2026-01-09-budget-performance.md · 355 words · 2026-01-09

Bluepoint Budget Performance — 2026-01-09

Overview

As of the January 9, 2026 check-in, the Bluepoint account is pacing significantly over budget for the current period. This was identified via the [1] budget pacing chart during a review with Karly Oykhman.

Budget Status

Metric Value
Target spend (to date) $584
Actual spend (to date) $838
Variance +$254 over target
Projected end-of-period overspend ~$800

The dotted target line in X-Ray showed spend should be at $584; actual spend of $838 puts the account on a trajectory to finish approximately $800 over the total period budget if the pace is not corrected.

Required Action

Karly Oykhman is responsible for reviewing the Bluepoint ad spend and adjusting pacing to bring the account back in line before the end of the billing period.

X-Ray Access Blocked (403 Error)

At the time of this review, Karly was unable to access Bluepoint data in X-Ray directly due to a 403 Forbidden permissions error surfaced in the browser console. Mark Hope identified this as a permissions loop in the X-Ray system and committed to fixing it over the weekend.

Until the permission issue is resolved, Karly cannot independently monitor budget pacing in X-Ray. Mark shared his screen during the call to surface the budget data shown above.

X-Ray Budget Pacing Feature

The budget pacing chart in X-Ray plots actual cumulative spend against a target spend curve for the period. A gap above the dotted target line indicates overpacing. This view is available under the client's account in X-Ray → Overview.

Sources

  1. X Ray|X Ray
  2. 2026 01 09 Gravity Forms Hubspot Mapping|Bluepoint Gravity Forms → Hubspot Mapping Fix — 2026 01 09
  3. Index|Bluepoint Client Index
  4. Karly — 2026 01 09