Two long-overdue Didion design deliverables were flagged as urgent in the [1]. Both tasks have been sitting since approximately April 2nd (nearly two weeks) and must be completed by Friday, March 28 so that Sebastian can implement the meta ads and schedule a training session with Roy.
If the design team cannot deliver by Friday, Melissa will take over — but requires access to the original working files (currently only compressed JPEGs are available).
| Owner | Action | Due |
|---|---|---|
| Design team (Łukasz/Mikhail) | Deliver Didion meta ad graphics and Masa Narepa sell sheet revisions | Fri 2026-03-28 |
| Melissa | Take over design tasks if files are shared and design team cannot complete | Fri 2026-03-28 |
| Sebastian | Once graphics are ready, implement meta ads and schedule training session with Roy | After graphics delivered |
Sebastian is blocked on Didion Meta Implementation until graphics are delivered. Once unblocked:
See also: [2]
"I wanted to have basically these metas done and up and running, because this again has been in here for a while… if they can't do it, they need to give me the access to the files, and I'll do them."
— Melissa Cusumano"I have to wait for the graphic, which is why [I'm blocked]."
— Sebastian Gant"If you're building them, it might be nice for Roy to watch you, because since he's been doing some of those trainings."
— Karly Oykhman