Weekly Blockers & Project Status — 2025-10-06

Captured from the weekly team stand-up on 2025-10-06. Several team members were absent (Sebastian, Mylene, Paul, Asalia). This article documents active blockers, project status, and immediate action items surfaced during the meeting.


Active Blockers

Lammary — Staging/Gmail Integration (Chris)

Chris is blocked on the Lammary project because the staging site's domain does not match the domain registered with Google/Gmail. This prevents OAuth-style connections from completing, making it impossible to test the Bookly ↔ Gmail/Google integration or the Bookly ↔ Square integration from staging.

Proposed resolution: Mark suggested creating a dummy live domain with its own G Suite account to serve as a proper test environment. This is a known limitation of staging environments — DNS records don't align, which breaks email and e-commerce integrations broadly.

Owner: Chris, with input from Mark on the dummy-domain approach.

"It's a challenge with e-commerce and checkouts. It's a challenge with email integration… It's very difficult to test that stuff from the staging environment because none of the DNS records line up." — Mark

See also: [1] | [2]


American Extractions — Google Ads Generating No Impressions (Gilbert)

Google Ads campaigns for American Extractions are live but producing zero impressions. Gilbert was attempting to create a new campaign using the Team Asymmetric email account but was locked out of LastPass due to too many failed attempts, further delaying the fix.

Owner: Gilbert — will retry campaign creation once LastPass access is restored.

See also: [3]


Big Millie — Amazon Listings Not Showing (Gilbert)

Two Amazon product listings for Big Millie have disappeared or are not displaying. This is a recurring issue. Gilbert plans to contact Amazon Seller Support directly.

Owner: Gilbert — will call Amazon support team.

See also: [4]


Karly — Typeset Access

Karly needs access to Typeset for content creation (eGuides for American Extractions, Quora Stones). The subscription had lapsed.

Resolution: Mark confirmed he will reactivate Typeset.


Projects in Progress

Three Gates — Capital Campaign Landing Page

A new single-page landing page is needed for Three Gates' capital campaign. Project materials (brief, assets) are in the Shared Drive under Projects → Three Gates → Capital Campaign.

See also: [5]


Didion Milling — Culinary Landing Page Form Integration ⚠️ URGENT

A new culinary landing page (sample request form) is built and technically live. It needs form integrations completed before a press kit goes out to retail contacts in the Chicago and Madison area. The launch was already delayed one week due to the build timeline.

What's needed:
1. Zapier → Google Sheets connection — Chris has connected the form to Zapier but needs a destination Google Sheet. Melissa is reaching out to Diana (client contact) to provide or create the sheet.
2. Email notifications — Two notifications needed: (a) admin/internal notification on submission, (b) confirmation email to the person submitting. Chris will model these after the existing Snack Meal form setup.
3. Fallback: Even without the Google Sheets connection, Gravity Forms will capture all submissions locally — no data will be lost if the Zapier integration isn't ready at launch.

Deadline: Within 24 hours (by Tuesday–Wednesday, 2025-10-07/08).

Owners:
- Chris — Zapier setup, notification configuration
- Melissa — accountable (client AM); reaching out to Diana for Google Sheet
- Sam — built the form; no further action needed

"In the next 24 hours would be great." — Melissa

See also: [6]


Other Team Status (No Blockers)

Team Member Focus This Week
Ben Analytics platform training; follow up with Sebastian on Sonoplot; send Bluepoint feedback to Sam
Raphael Agility Recovery updates; Citrus America
Avoke Tasks from Karly; AC bio-organization
Andrzej Completed Doodla Farms landing page; Citrus America flyers print-ready; Łukasz on Blue Sky LP + Quara Italia + Wussi EDC; Michał on Didion design corrections
Isahaque Various site updates
Aki VLAS website pages + maintenance; awaiting assets from Łukasz
Anup Completed GTM/GA4 setups (Shine Contraction Cleaning, Neudon Therapy); conversion tracking (Hopar, Exilary); JFO events verified; Bluepoint ad events reactivated; today: Agility Google Ads optimization
Gilbert Citrus analytics (in progress)
Sam Finalizing Didion Massa Flower project; Bluepoint contact form update
Yashwant Cypress America; GBP posts for Adawa Care; Big Belief error fixes; upcoming: Uberport, Cuxley, Adawa, Neudon Therapy

Action Items Summary

# Action Owner Due
1 Resolve Lammary staging/Gmail blocker (dummy domain approach) Chris + Mark TBD
2 Fix American Extractions Google Ads impressions issue Gilbert ASAP
3 Call Amazon re: Big Millie listing visibility Gilbert ASAP
4 Reactivate Typeset subscription Mark Today
5 Send Three Gates additional brief to Melissa Mark Today
6 Review Three Gates folder; create ClickUp tasks Melissa Today
7 Contact Diana re: Google Sheet for Didion form Melissa Today
8 Complete Zapier connection + email notifications for Didion culinary form Chris Within 24 hrs
9 Send Bluepoint feedback to Sam Ben Today