Salesforce Project Number Automation — Quarra
Overview
Sergei's team completed an automation that generates a project number on new Salesforce leads at the point of creation. This automation was built and tested in sandbox for the Cora Italia / Quarra account. As of the 2025-10-27 weekly call, it was ready to push to production pending final sign-off.
The launch plan was confirmed: deploy Thursday night, live test Friday during the standing Salesforce call with the client (Lincoln's team).
What the Automation Does
- Triggers on new lead creation in Salesforce
- Automatically populates a project number (prospect number) field on the lead record
- Eliminates the need for manual entry of project identifiers at the top of the funnel
Launch Plan
| Step | Timing | Owner |
|---|---|---|
| Push automation to production | Thursday night | Sergei's team |
| Notify Karly immediately on deploy | Thursday night | Sergei's team |
| Live test: create a new lead, confirm project number populates | Friday Salesforce call | Karly + Lincoln's team |
Rationale for this sequence: The automation is difficult to fully validate in sandbox alone. Pushing Thursday night gives a clean window before the Friday call, where the team can walk through it together with the client watching.
Testing Protocol
- After deploy, create a new lead in the production Salesforce org
- Confirm the project number field is auto-populated on save
- Verify no unexpected side effects on existing lead records
- Document result during the Friday call for client sign-off
Key Decisions
- Do not wait for a separate test call — use the existing Friday Salesforce call as the live validation session
- Sergei's team should notify Karly immediately upon deploying to production so she can confirm the environment is ready before the Friday call
- If minor glitches appear post-deploy, they are expected and acceptable given sandbox limitations; the Friday call is the safety net
Context & Related Work
This automation is part of a broader Salesforce buildout for the Cora Italia account, managed through Lincoln. A separate folder/project initiative (involving a call with Vieth) is still pending — Lincoln has not yet confirmed scheduling.
The Cora Italia account also has an outstanding payment issue for previously delivered pages. Per the 2025-10-27 call, Karly is following up with Lincoln on payment status. Future work beyond the automation launch may be gated on resolution of that invoice.
See also:
- [1]
- [2]
Action Items (from 2025-10-27 call)
- [ ] Email Sergei: push project-number automation to production Thursday night; notify Karly on deploy; plan to test live Friday with Lincoln (@Karly Oykhman)
- [ ] Confirm Friday Salesforce call is still on with Lincoln's team (@Karly Oykhman)