During the final team stand-up of 2025 (December 29), Łukasz Bugajski was assigned the creation of a location page template for Advanced Health & Safety (AHS) as his top priority task for the week. This came up as Łukasz sought clarification on which of his two queued projects to tackle first.
Łukasz was holding two active design tasks heading into the final week of 2025:
With Mikael and Andre on holiday leave, Łukasz was the sole designer available for the week. Melissa confirmed the prioritization directly in the stand-up:
"I would say, do a template for the Advanced Health and Safety, and then circle back to the Seamless."
| Field | Detail |
|---|---|
| Client | Advanced Health & Safety (AHS) |
| Deliverable | Location page template |
| Assigned To | Łukasz Bugajski |
| Priority | High — complete before SBS work |
| Timeline | Week of 2025-12-29 |